Skip to main content
Since 1995 · ICT partner to Pakistan’s banks, regulators and enterprises

Public sector

DGIP: Biometric Scanners & Servers

The award combines Suprema RealScan G-10 multifinger scanners with Lenovo ThinkSystem SR630 V3 servers for a biometric identification system upgrade. Capture devices and server infrastructure serve distinct roles. The award establishes the specified equipment scope rather than a completed identity-system rollout, a biometric database specification or a claim about identification accuracy.

2 min read · Documented project scope

Research reviewed

In this article

Project overview

Directorate General of Immigration & Passports: Biometric scanners and server infrastructure.

The award combines Suprema RealScan G-10 multifinger scanners with Lenovo ThinkSystem SR630 V3 servers for a biometric identification system upgrade. Capture devices and server infrastructure serve distinct roles. The award establishes the specified equipment scope rather than a completed identity-system rollout, a biometric database specification or a claim about identification accuracy.

Equipment and commissioned scope

The supplied records identify the following equipment or service requirements. The listed models describe the recorded procurement, rather than a current product recommendation or an assumption about every device used by the organization.

  • Suprema RealScan G-10 multifinger scanner devices
  • Lenovo ThinkSystem SR630 V3 entry-level servers
  • Award issued for the biometric identification system upgrade project

Technical scope and implementation boundaries

Suprema RealScan G-10 and Lenovo ThinkSystem SR630 V3.

Handover and support considerations

For a comparable installation, the review should connect the equipment schedule with the physical location and the responsibilities for configuration. Connectivity, power, mounting and the handoff between components need to be checked against the agreed design. Where installation or commissioning is ordered, its acceptance evidence should remain distinguishable from the initial equipment award. Manufacturer capabilities describe what a product family can support; they do not prove that every option was installed in this project.

Project record

This profile describes the scope recorded in the supplied purchase orders or award documents. These records establish the procurement scope; they do not establish final delivery, go-live or measured business outcomes.

Planning a similar requirement

Use the documented scope as a starting point for a fresh requirements review. Confirm the users or site, the configuration schedule, installation responsibilities and the support period before requesting a proposal. MMC can review supply and service requirements with your team; availability and contemporary alternatives need to be assessed for the new engagement.

Discuss a similar project with MMC

Sources and project evidence

Project facts are drawn from the supplied procurement and acceptance records. Public vendor references explain product categories; the ordered configuration and project status come from those records.

Our reach

Countries we serve

  • Pakistan flagPakistan
  • USA flagUSA
  • Australia flagAustralia
  • Belgium flagBelgium
  • Paraguay flagParaguay
  • Denmark flagDenmark
  • UK flagUK
  • Afghanistan flagAfghanistan
  • Philippines flagPhilippines
  • Turkey flagTurkey
  • Thailand flagThailand
  • Canada flagCanada
  • Sweden flagSweden
  • Singapore flagSingapore
  • Colombia flagColombia
  • UAE flagUAE
  • New Zealand flagNew Zealand
  • Kyrgyzstan flagKyrgyzstan
  • France flagFrance
  • Switzerland flagSwitzerland
  • Tanzania flagTanzania
  • Uganda flagUganda
  • Tajikistan flagTajikistan
  • China flagChina
  • Italy flagItaly
  • Finland flagFinland
  • Qatar flagQatar
  • Zimbabwe flagZimbabwe
  • Saudi Arabia flagSaudi Arabia